Terms & Conditions for Worksite

Braithwaite Build (Ben Braithwaite, trading as Braithwaite Build)

Last updated: 11 November 2025

These Terms & Conditions set out how we will work with you to deliver building and renovation services in a professional and well-managed manner.

For the purposes of these Terms, “we”, “us”, and “our” refer to Braithwaite Build (Ben Braithwaite, trading as Braithwaite Build).

For the purposes of these Terms, “client” and “you” refers to the person(s) or organisation responsible for commissioning and paying for the works, whether acting for themselves or on behalf of another party.

These Terms are designed to provide clarity, protect both parties, and ensure a smooth and well-communicated project.

1. Scope of Works

A detailed scope of works and/or specification will be provided as part of the quotation. This will outline what is included in the project. Any items not listed should be considered excluded.

Where fixture, fittings, finishes, or decorative elements are to be chosen by the client, these will be confirmed before pricing is finalised. If choices change after work begins, the price and programme may need to be adjusted.

2. Quotation & Pricing

All quotations are based on the information available at the time of pricing. Where assumptions are required (e.g., structure, existing conditions, access, or concealed work), these will be noted.

If additional or unforeseen work is required once work begins (for example, issues uncovered during strip-out), we will discuss this with you before proceeding and provide a revised price where necessary.

3. Variations (Changes to the Work)

If you request changes, additions, or alternative materials after the quotation has been agreed, these will be treated as variations.

Variations will be discussed and agreed before work proceeds, and charged in addition to the original quotation.

A written confirmation (email or text message) is required to approve variations before they are carried out.

4. Payment Terms

Payment structure will be agreed based on the scale of the project:

- For larger projects (e.g., extensions, refurbishments): Deposit, stage payments, final payment

- For smaller projects (e.g., bathrooms, kitchens): Deposit, balance payable on completion

- For ongoing or flexible works: Weekly invoices based on works completed

Invoices are due within 7 days, unless explicitly agreed otherwise in writing.

Late payments may result in work being paused until the account is settled.

5. Waste Removal

Waste removal and skips are not included unless specifically stated in the quotation.

If needed, we can arrange waste removal or skip hire, which will be charged separately.

6. Access & Working Conditions

The client is responsible for providing safe access to the property during agreed working hours.

Works may create dust, noise, and temporary disruption. Reasonable care will be taken to protect existing finishes and minimise inconvenience.

7. Subcontractors & Suppliers

Where specialist trades are required, we may use trusted subcontractors.

Client contact details (name, address, phone number) may be provided to subcontractors only where necessary to carry out the work.

8. Materials & Fixtures

Where the client is supplying materials or fixtures, these should be on site when needed. Delays in supply may affect the programme.

If materials prove unsuitable or faulty, additional time or cost may be required to resolve.

9. Guarantees & Workmanship

All work will be carried out with care, skill, and in line with relevant standards.

Workmanship is guaranteed for 12 months from completion unless otherwise agreed.

Manufacturer warranties apply to products and fixtures supplied by the client or suppliers.

10. Cancellation

If the client needs to cancel or postpone the work, as much notice as possible should be provided. Deposits may be retained to cover time, materials, and scheduling already committed.

11. Disputes & Communication

Our aim is to maintain clear communication throughout the project. If any issue or concern arises, it should be raised promptly so it can be addressed professionally and without delay.

12. Agreement

By confirming acceptance of the quotation (in writing, text, or email), the client confirms they have read and agree to these Terms & Conditions.